"Eleventh Five-Year Development Plan for Zhangzhou City Power Grid" has been completed

According to the overall requirements of the State Grid Corporation for urban power grid planning, in order to meet the needs of industrial and agricultural production and people's living standards in Chenzhou City, to ensure the sustainable and healthy development of the national economy of Chenzhou City, according to the Shanxi Electric Power Company's preparation According to the guidance of the “Eleventh Five-Year Plan Report” of the urban power grid, the Zhangzhou Power Supply Branch has conducted in-depth and meticulous investigation and research on the development of social economy and urban construction in Ganzhou City under the strict control of the leaders and the joint efforts of relevant personnel. Extensively collecting data, analyzing and studying the structure and trends of the power market, and combining the overall vision of urban development planning, completed the preparation of the “Eleventh Five-Year Development Plan for Zhangzhou Urban Power Grid”.

The planning scope includes Quzhou City and Pinglu District, with the urban power grid planning as the main component, with a total estimated investment of 438 million yuan. The planning contents include high, medium and low voltage transmission and distribution networks, substation layout, relay protection, communication, information, automation, etc. within the scope of Chenzhou City. The planning period is from 2006 to 2010, and the high-voltage distribution network appropriately looks forward to the load development needs in 2020, so as to reserve certain sites and route corridors. Through this planning, it is expected that at the end of the “Eleventh Five-Year Plan”, the 110 kV substation of Zhangzhou Power Grid will realize double power supply and double main transformer, and the power supply will automatically cast each other. The double main variable capacity ratio is not less than 2.0; the system above 110 kV and mainly The 35 kV system meets the N-1 criterion; the substation below 110 kV achieves 100% unattended; the main network voltage pass rate reaches 99%, and the integrated voltage pass rate reaches 98%. The harmonics meet the relevant regulations of the power industry. The communication system and information system realize SDH optical transmission, and the backbone transmission network has 622M bandwidth.

This urban network plan fully considers the growth of power demand and the spatial distribution of load. With the demand of power, it will be beneficial to achieve a win-win situation for the company's economic and social benefits in the next five years.
The authenticity of this information has not been confirmed by the international electrical network, for your reference only.
From: Power Equipment Network

Pile Driver

Fence post driver size :600mm,750mm,800mm long

60mm or 75mm outer diameter
pvc coated or hot dip galvanized

EPE wrapped then in cartons

Manual post hammer for Star Picket,T post,Y fence post

Pile Driver Also called Post driver

Our factory mainly manufacture and export Y fence post,Post driver,post hammer,and other accessories for farm post,ect.
.

Surface: hot-dip galvanized, Powder coated

Post driver available:

Light Duty Diameter (MM): 60mm; Length (MM): 600mm ;750mm; 800mm etc.

Light Duty Diameter (MM): 75mm; Length (MM): 600mm ; 750mm; 800mm etc.

Thickness: 3.0-4.0mm steel pipe

Packing: EPE wrapped then in cartons

Application:

Reduce work injury with this Post driver/Pile driver that easily driver steel posts into solid ground.

pile driver 1pile driver 2




Pile Driver,Pile Driving Machine,Fence Post Driver,Post Driver

BAODING JIMAOTONG IMPORT AND EXPORT CO., LTD , https://www.chinagroundscrew.com