Datansha Sewage Treatment System Pipeline Network Project — Irrigation Drainage Drainage Tank (Shichonghe Section) of Shijinghe River Main Stream (Shijinghe, Xinshiyong)...

The Datang Sewage Treatment System Pipeline Network Project - Shijinghe River Mains (Shijinghe, Xinshiyong) Sewage Drainage Drainage Tank (Xinshiyong Section) has been approved by the Guangzhou Municipal Development and Reform Commission with the approval of No.33 Document No. [2015] issued by Guangzhou Development and Reform Commission. The project owner is Guangzhou City Water Purification Co., Ltd. The construction fund is from the Guangzhou Municipal Finance Fund and the Guangzhou City Shuitou Group Fundraising Fund. The proportion of the project's investment is 100%. The bidder is Guangzhou City Water Purification Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing an open tender for the project design, procurement, and construction general contract (EPC) project.

2. Project overview and scope of tender
2.1 Project Name: Datansha Sewage Treatment System Pipeline Network Project - Irrigation Drainage Drainage Tank (Shijinghe Section, Xinshigyong) of Shijinghe River (New Ichong Section) Project Design Optimization Design - Procurement - Construction General Contracting (EPC)
2.2 Construction site: Along the main stream of the Shijing River in Guangzhou (Xinshiyong Section).
2.3 Project Scale and Construction Content:
The total length of the main engineering canal is 4757m, among which the length of the canal is 3563m, B×H=4×3 or B×H=4×4. The open cut construction is adopted; the length of the pipeline is 1194m and the diameter of the pipe is DN2000~DN3000. Buried, see tender documents.
2.4 Project Budget Investment:
Estimated total investment: about 4.49592 billion yuan, of which the engineering cost is about 321.9383 billion yuan;
2.5 Total planned duration: Completion of acceptance must be completed within 36 months after signing the contract.
2.6 Scope of Bidding: Optimization of Construction Drawings, Procurement and Storage of Material Equipment, Construction [Contain civil engineering and inflow facilities, civil engineering, process equipment, electrical equipment, installation of self-control equipment, external water and external power projects, etc.] Excluding housing and construction water supply in Baiyun District The implementation of the Bureau (1, well number w20 ~ w21, length 66m; 2, well number w27 ~ w42, length 1205m; well number w51 ~ w58-1, length 726m), completion acceptance, settlement and completion acceptance, warranty and other work.
2.7 Division: One bid section.
2.8 The bid applicant may not have one of the following circumstances:
(1) An affiliate (unit) that does not have independent legal personality as the bidder;
(2) Provide consulting services for the preliminary work of the tendering project.
(3) The supervisor of this tender project;
(4) The agent of this bidding project;
(5) Providing tender agency services for this tender project;
(6) Being a legal representative together with the supervisor or agent or bid agency of the bidding project;
(7) Holding or participating in shares with the supervisor or agent or tender agency of the tender project;
(8) Working with or working with the supervisor or agent or bid agency of the tendering project;
(9) was ordered to suspend business;
(10) being suspended or canceled;
(11) The property was taken over or frozen;
(12) The person in charge of the different bid applicants is the same person or a different unit that has a controlling relationship or a management relationship, and participates in the bid for the same tender item or the same tender item that is not divided into bid segments.

High Power H Series Lead Acid Battery

High Rate Discharge Battery,High Energy Battery,High Output Battery,H Series Lead Acid Battery

Wolong Electric Group Zhejiang Dengta Power Source Co.,Ltd , https://www.wldtbattery.com